I-95 South Bridge Maintenance Traffic Shift
Sector: Road • Location: Georgia, United States
Source: Grice Connect
Traffic lanes on I-95 South near Exit 87 will be shifted east using the inside shoulder as part of a bridge maintenance project. The work includes lane closures and traffic modifications to facilitate the maintenance and extend the bridge's lifespan.
- Status
- Under Construction
- Sector
- Road, Bridge, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Grice Connect
ConstructChat
Ask ConstructChat about I-95 South Bridge Maintenance Traffic Shift
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Traffic lanes on I-95 South near Exit 87 will be shifted east using the inside shoulder as part of a bridge maintenance project. The work includes lane closures and traffic modifications to facilitate the maintenance and extend the bridge's lifespan. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Grice Connect |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
