I-95 Widening from South of Emerson Street to Atlantic Boulevard
Sector: Road • Location: Jacksonville, Florida, United States of America
Source: Florida Department of Transportation (FDOT)
This design-build project (FIN 432259-2) consists of the reconstruction of I-95 from south of Emerson Street (State Road 126) to Atlantic Boulevard (State Road 10). The anticipated project limits along I-95 extend from approximately 2,700 feet south of Emerson Street to 2,400 feet south of Atlantic Boulevard. Project improvements include: Adding lanes to I-95 southbound and I-95 northbound for a t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This design-build project (FIN 432259-2) consists of the reconstruction of I-95 from south of Emerson Street (State Road 126) to Atlantic Boulevard (State Road 10). The anticipated project limits along I-95 extend from approximately 2,700 feet south of Emerson Street to 2,400 feet south of Atlantic Boulevard. Project improvements include: Adding lanes to I-95 southbound and I-95 northbound for a total of 5 travel lanes in each direction Raising the profile of I-95 to improve sight distance Replacing the bridges over Emerson Street and San Diego Road Resurfacing Emerson Street from U.S. 1 to Spring Park Road (FIN 445343-1) Reconfiguring the interchange at Emerson Street as a median U-turn interchange Constructing a cul-de-sac at the north end of Indigo Drive Constructing cul-de-sacs at several other locations within the project limits Installing drainage improvements along I-95 Constructing additional retention ponds Replacing all lighting along I-95 Replacing all ITS components Replacing overhead signage Updating traffic signals Adding and replacing sound walls Relocating utilities Superior Construction Company was selected to complete both projects. Construction activities will take place during daytime and nighttime hours. Pile driving operations may occur during daylight hours only, seven days a week. The following lane closure restrictions will be in place throughout construction: I-95 and Ramps No single lane closures allowed from 6 a.m. to 9 p.m. Monday through Thursday, 6 a.m. to 10 p.m. Friday and 8 a.m. to 10 p.m. Saturday and Sunday. No double lane closures, triple lane closures or detours allowed from 5 a.m. to 10 p.m. Monday through Thursday, 5 a.m. to 11:59 p.m. Friday, 7 a.m. to 11:59 p.m. Saturday and 7 a.m. to 10 p.m. Sunday. With prior approval, single lane closures for pile driving activities may be allowed during daylight hours on Saturday. Emerson Street No lane closures allowed from 7 a.m. to 7:30 p.m. seven days a week, except for pile driving in the median of Emerson Street, which may utilize single lane closures eastbound and single lane closures westbound from 9 a.m. to 3 p.m. No detours allowed from 5 a.m. to 10 p.m. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
