logo

Iacanga Thermal Power Plant

Active · Sao Paulo

Source: World Bank Group

Project
Active

The Brazilian company Usina Iacanga de Acucar e Alcool S.A., a subsidiary of Usina Ipiranga de Acucar e Alcool, was granted an authorization to build and operate a sugar-cane-residue fueled power plant located in the states of Sao Paulo (32 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in November 2007.

The government periodically runs public bidding

Status
Prospective
Sector
Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Manufacturing (Industrial), Biomass
Location
Sao Paulo, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Iacanga Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Iacanga Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Sao Paulo, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Usina Iacanga de Acucar e Alcool S.A., a subsidiary of Usina Ipiranga de Acucar e Alcool, was granted an authorization to build and operate a sugar-cane-residue fueled power plant located in the states of Sao Paulo (32 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in November 2007. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. The UTE Iacanga won the public bidding that took place in 2007 by offering a tariff of US$ 69.5/MWh (BRL 138.9/MWh), and in 2014, by offering a tariff of US$ 85.9/MWh (BRL 201.9/MWh). The project company signed 15-year power purchase agreements with the several electricity distribution companies. In the first public bidding, UTE Iacanga committed to start supplying to the market in 2010; in the second, the commitment was for January 2019. The first two generating units of the power plant, with 12 MW in capacity, commenced commercial operations in 2010. The investment in these units was estimated at US$ 12 million (BRL 21 million). A second unit, with 20 MW in capacity, required an investment of US$ 4.5 million (BRL 10.6 million) and commenced operations in April 2014. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

State

Sao Paulo

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Manufacturing (Industrial), Biomass

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project