IA/DOT: 10th St Otter Creek Bridge Replacement (CO 003)
Sector: Water Supply and Storage • Location: Oelwein, Iowa, United States of America
Source: Dodge
Brm-5657(614)--8N-33 Route: 10Th St Sw In The City Of Oelwein, On 10Th St Sw, Over Otter Creek, S28 T91 R09 1.00 Each Aprons 15.00 Each Beams, Pretens. Prestr. Conc. 0.72 Acre Clearing & Grubbing 28.00 Linear Foot Culvert Pipe 56.00 Square Yard Drives, P.C.C. 1,310.00 Square Yard Engineering Fabric 295.00 Cubic Yard Excavation Class 10 4,107.00 Cubic Yard Excavation Class 13 104.00 Cubic Yard Exca
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Bridge, Waste Processing and Treatment
- Location
- Oelwein, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about IA/DOT: 10th St Otter Creek Bridge Replacement (CO 003)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Brm-5657(614)--8N-33 Route: 10Th St Sw In The City Of Oelwein, On 10Th St Sw, Over Otter Creek, S28 T91 R09 1.00 Each Aprons 15.00 Each Beams, Pretens. Prestr. Conc. 0.72 Acre Clearing & Grubbing 28.00 Linear Foot Culvert Pipe 56.00 Square Yard Drives, P.C.C. 1,310.00 Square Yard Engineering Fabric 295.00 Cubic Yard Excavation Class 10 4,107.00 Cubic Yard Excavation Class 13 104.00 Cubic Yard Excavation Class 20 106.00 Cubic Yard Excavation Class 21 55.00 Ton Granular Shoulders, Type A 85.00 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Oelwein |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Bridge, Waste Processing and Treatment |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
