IA/DOT: A39 Precast RCB Culvert (CO 303)
Sector: Water Supply and Storage • Location: Grafton, Iowa, United States of America
Source: Dodge
On A39, Over Winans Creek, S10 T98 R22. 3.00 Each Aprons 1.00 Lump Sum Construction Survey 185.00 Linear Foot Culvert Pipe 95.20 Linear Foot Culvert, Precast 214.60 Square Yard Engineering Fabric 790.00 Cubic Yard Excavation Class 10 31.60 Cubic Yard Excavation Class 13 619.00 Cubic Yard Excavation Class 20 41.90 Cubic Yard Granular Backfill 186.00 Ton Revetment 1.66 Station Shoulder Construction
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Grafton, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about IA/DOT: A39 Precast RCB Culvert (CO 303)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On A39, Over Winans Creek, S10 T98 R22. 3.00 Each Aprons 1.00 Lump Sum Construction Survey 185.00 Linear Foot Culvert Pipe 95.20 Linear Foot Culvert, Precast 214.60 Square Yard Engineering Fabric 790.00 Cubic Yard Excavation Class 10 31.60 Cubic Yard Excavation Class 13 619.00 Cubic Yard Excavation Class 20 41.90 Cubic Yard Granular Backfill 186.00 Ton Revetment 1.66 Station Shoulder Construction 169.80 Ton Surfacing, Crushed Stone 252.00 Cubic Yard Topsoil, Strip/salvage/spread |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Grafton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
