IA/DOT: Bridge Replacement - PPCB (004)
One of 10,000+ projects Taiyo tracks in Iowa.
Source: Dodge USA
On 235th Street over Wapsi backwater, S12,T81,R112.00 EACH BEAMS, PRETENS. PRESTR. CONC. 0.20 ACRE CLEARING & GRUBBING 1.00 LUMP SUM CONSTRUCTION SURVEY 670.00 SQUARE YARD ENGINEERING FABRIC 1,493.00 CUBIC YARD EXCAVATION CLASS 10 440.00 CUBIC YARD EXCAVATION CLASS 20 288.00 CUBIC YARD EXCAVATION CLASS 21 30.00 CUBIC YARD MODIFI
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Bridge, Road
- Location
- Clinton, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about IA/DOT: Bridge Replacement - PPCB (004)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On 235th Street over Wapsi backwater, S12,T81,R112.00 EACH BEAMS, PRETENS. PRESTR. CONC. 0.20 ACRE CLEARING & GRUBBING 1.00 LUMP SUM CONSTRUCTION SURVEY *Quantities for Items bid as Alternates are overstated. See Proposal* 670.00 SQUARE YARD ENGINEERING FABRIC 1,493.00 CUBIC YARD EXCAVATION CLASS 10 440.00 CUBIC YARD EXCAVATION CLASS 20 288.00 CUBIC YARD EXCAVATION CLASS 21 30.00 CUBIC YARD MODIFIED SUBBASE 1.20 ACRE MULCHING 12.60 STATION PAVEMENT MARKINGS 117.80 SQUARE YARD PAVEMENT, P.C.C.... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Clinton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Bridge, Road |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
