IA/DOT: Edgewood Rd Pcc Sidewalk/Trail (CO 103)
Sector: Water Supply and Storage • Location: Cedar Rapids, Iowa, United States of America
Source: Dodge
WORK TYPE: PCC SIDEWALK/TRAIL In the city of Cedar Rapids, EDGEWOOD RD NE; Glass Rd NE to N Rvr Blvd NE; Crss Point Blvd NE to Twn Cntr Way NE. 2.00 EACH APRONS 21.90 TON ASPHALT BINDER 96.80 UNITS CLEARING & GRUBBING 1.00 LUMP SUM CONSTRUCTION SURVEY 2,396.00 LINEAR FOOT CURB & GUTTER P.C.C. 4,713.00 CUBIC YARD EMBANKMENT-IN-PLACE 2,175.00 CUBIC YARD EXCAVATION CLASS 10 1,350.00 LINEAR FOOT FENCE
- Status
- Prospective
- Sector
- Water Supply and Storage, Rail, Power Transmission, Waste Processing and Treatment, Mass Transit, Road, Car parking, Commercial, Automotive, Power Generation (CCGT)
- Location
- Cedar Rapids, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about IA/DOT: Edgewood Rd Pcc Sidewalk/Trail (CO 103)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WORK TYPE: PCC SIDEWALK/TRAIL In the city of Cedar Rapids, EDGEWOOD RD NE; Glass Rd NE to N Rvr Blvd NE; Crss Point Blvd NE to Twn Cntr Way NE. 2.00 EACH APRONS 21.90 TON ASPHALT BINDER 96.80 UNITS CLEARING & GRUBBING 1.00 LUMP SUM CONSTRUCTION SURVEY 2,396.00 LINEAR FOOT CURB & GUTTER P.C.C. 4,713.00 CUBIC YARD EMBANKMENT-IN-PLACE 2,175.00 CUBIC YARD EXCAVATION CLASS 10 1,350.00 LINEAR FOOT FENCE, CHAIN LINK 365.00 TON HOT MIX ASPHALT 17.00 EACH INTAKES & MANHOLES/UTILITY ACCESS 2,052.00 CUB... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Cedar Rapids |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Power Transmission, Waste Processing and Treatment, Mass Transit, Road, Car parking, Commercial, Automotive, Power Generation (CCGT) |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
