IA/DOT: T 62 Mitchell Bridge Replacement (CO 009)
Sector: Water Supply and Storage • Location: Mcintire, Iowa, United States of America
Source: Dodge
Hdp-c066(88)--6B-66 Route: T62 On T 62, Over Wapsipinicon River, S14 T99 R15 0.10 Acre Clearing & Grubbing 1.00 Lump Sum Construction Survey 773.30 Square Yard Engineering Fabric 1,591.80 Cubic Yard Excavation Class 10 30.30 Cubic Yard Excavation Class 13 111.00 Cubic Yard Excavation Class 20 519.00 Linear Foot Guardrail, Formed
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Bridge, Rail, Waste Processing and Treatment, Cement, Commercial, Steel, Mass Transit, Metal
- Location
- Mcintire, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about IA/DOT: T 62 Mitchell Bridge Replacement (CO 009)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hdp-c066(88)--6B-66 Route: T62 On T 62, Over Wapsipinicon River, S14 T99 R15 0.10 Acre Clearing & Grubbing 1.00 Lump Sum Construction Survey 773.30 Square Yard Engineering Fabric 1,591.80 Cubic Yard Excavation Class 10 30.30 Cubic Yard Excavation Class 13 *Quantities For Items Bid As Alternates Are Overstated. See Proposal* 111.00 Cubic Yard Excavation Class 20 519.00 Linear Foot Guardrail, Formed Steel Beam 773.30 Square Yard Longitudinal Grooving In Concrete 74.80 Cubic Yard Modified Subbas... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Mcintire |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Bridge, Rail, Waste Processing and Treatment, Cement, Commercial, Steel, Mass Transit, Metal |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
