IA/DOT: US Hwy 20 Subdrain Tile Repair REBID BDE
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Iowa Department of Transportation's District 6 is seeking bids for a qualifed contractor to; Repair subdrain tile along the north side of US Highway 20 from milepost 250.8-250.9 (Station 301+40 to 304+90) as per scope & specifications. This project is located in Buchanan County. Please see Attachment tab for relevant documents. Scope: In the north ditch parallel to US 20, there is a 10 tile ap
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Waste Processing and Treatment
- Location
- Independence, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about IA/DOT: US Hwy 20 Subdrain Tile Repair REBID BDE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Iowa Department of Transportation's District 6 is seeking bids for a qualifed contractor to; Repair subdrain tile along the north side of US Highway 20 from milepost 250.8-250.9 (Station 301+40 to 304+90) as per scope & specifications. This project is located in Buchanan County. Please see Attachment tab for relevant documents. Scope: In the north ditch parallel to US 20, there is a 10 tile approximately 370 feet long that is plugged and needs to be replaced. Tile to be replaced is a 10 d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Independence |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Waste Processing and Treatment |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
