IAH Runway 9/27 Resurfacing and Lighting Improvement Project
Sector: Airport • Location: Houston, Texas, United States
Source: ABC13 Houston
The project involves a 90-day resurfacing and lightning improvement of runway 9/27 at Houston's George Bush Intercontinental Airport (IAH). It includes grinding the concrete surface, retexturing, regrooving, and installing 380 new LED runway lights to enhance pilot visibility and extend the life of critical airport infrastructure.
- Status
- Under Construction
- Sector
- Airport, Aerospace & Defense, Cement
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- ABC13 Houston
ConstructChat
Ask ConstructChat about IAH Runway 9/27 Resurfacing and Lighting Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves a 90-day resurfacing and lightning improvement of runway 9/27 at Houston's George Bush Intercontinental Airport (IAH). It includes grinding the concrete surface, retexturing, regrooving, and installing 380 new LED runway lights to enhance pilot visibility and extend the life of critical airport infrastructure. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | ABC13 Houston |
URL |
More Details
Record type | Project |
Sector | Airport, Aerospace & Defense, Cement |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
