IAH Terminal A Modernization Program
Sector: Power Generation (CCGT) • Location: Houston, Texas, United States of America
Source: Dodge
Upgrade or replace infrastructure, finishes and other items in Terminal A. The project will include, but is not limited to, replacing all existing passenger loading bridges, aircraft support systems (ground power and pre-conditioned air), upgrade existing restrooms to meet code, construct FAA mandated Service Animal Relief Areas (SARAs)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Upgrade or replace infrastructure, finishes and other items in Terminal A. The project will include, but is not limited to, replacing all existing passenger loading bridges, aircraft support systems (ground power and pre-conditioned air), upgrade existing restrooms to meet code, construct FAA mandated Service Animal Relief Areas (SARAs) |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- TENANT IMPROVEMENT FOR A NAIL SALON, ELECTRICAL, VENT IN BATHROOM
