logo

Ibitiuva Bioenergetica Biomass TPP

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

On August 13, 2008 Consorcio Andrade consisiting of Ibitiuva Bionergetica SA (a subsidiary of Tractabel) and Andrade Acucar e Alcool SA won a 15-year, 20MW power purchase agreement in a public bidding that set up by Brazil's CCEE (Energy Trading Board). The effective date of the contract was 03/01/2010 with termination on 02/28/2025.

The energy was to be produced by a sugar cane bagasse-fired e

Status
Prospective
Sector
Biomass, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ibitiuva Bioenergetica Biomass TPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ibitiuva Bioenergetica Biomass TPP” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On August 13, 2008 Consorcio Andrade consisiting of Ibitiuva Bionergetica SA (a subsidiary of Tractabel) and Andrade Acucar e Alcool SA won a 15-year, 20MW power purchase agreement in a public bidding that set up by Brazil's CCEE (Energy Trading Board). The effective date of the contract was 03/01/2010 with termination on 02/28/2025. The energy was to be produced by a sugar cane bagasse-fired electricity generation plant with an installed capacity of 33 MW located in the state of Sao Paulo. The total project cost was estimated at BRL 119 million (US $67.9 million). This capex included upgrades to the existing sugar cane facility and an associated transmission line. Brazil's state owned bank BNDES offered four credits totally BRL 82.5 million (US $48.6 million). The credits were given at various times but at least R$ 63 million was drawn down during 2010. Commercial operations commenced in September 2010.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project