logo
ProjectBid Results

Ice Harbor Dam Eim Metering Additions

Bid results · Washington · Last reported Nov 2024

Source: Dodge USA

Ice Harbor has six main power generating units in the powerhouse. There is a transformer canyon located adjacent to the main powerhouse that consists of all the electrical equipment to deliver the generated power to the electrical grid including step up transformers, surge protective devices, disconnect switches, and SF6 gas breakers. There are three outgoing 115 kilovolt (KV) power lines that exi

Status
Closed
Sector
Hydro, Seaport, Commercial, Power Generation (CCGT), Power Transmission, Water Supply and Storage, Manufacturing (Industrial)
Location
Burbank, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Ice Harbor Dam Eim Metering Additions

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ice Harbor Dam Eim Metering Additions” is an infrastructure initiative in the Hydro sector, located in Burbank, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ice Harbor has six main power generating units in the powerhouse. There is a transformer canyon located adjacent to the main powerhouse that consists of all the electrical equipment to deliver the generated power to the electrical grid including step up transformers, surge protective devices, disconnect switches, and SF6 gas breakers. There are three outgoing 115 kilovolt (KV) power lines that exit the transformer canyon to the power grid. This project will install bi-directional, automatic g...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Burbank

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Seaport, Commercial, Power Generation (CCGT), Power Transmission, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project