logo
ProjectClosed

ID/DOT: SH 41 TO US 95 Pavement Reconstruct

Closed · Idaho · Last reported Jan 2025

Source: Dodge

SH 41 TO US 95 WEST, KOOTENAI CO Construction engineering, inspection, sampling and testing services for I-90, SH-41 to US-95 West. Project include reconstruct and expand I-90 between SH-41 and Huetter (MP 7.128 - 9.714). Existing lanes will be reconstructed and additional travel and auxiliary lanes will be installed. Retaining walls will be constructed and the bridges will be replaced at Huetter

Status
Closed
Sector
Bridge, Road, Manufacturing (Industrial), Commercial
Location
Coeur D'Alene, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about ID/DOT: SH 41 TO US 95 Pavement Reconstruct

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ID/DOT: SH 41 TO US 95 Pavement Reconstruct” is an infrastructure initiative in the Bridge sector, located in Coeur D'Alene, Idaho, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SH 41 TO US 95 WEST, KOOTENAI CO Construction engineering, inspection, sampling and testing services for I-90, SH-41 to US-95 West. Project include reconstruct and expand I-90 between SH-41 and Huetter (MP 7.128 - 9.714). Existing lanes will be reconstructed and additional travel and auxiliary lanes will be installed. Retaining walls will be constructed and the bridges will be replaced at Huetter Rd.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Coeur D'Alene

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Road, Manufacturing (Industrial), Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project