IDIQ Barrow Coastal Erosion Protection SATOC SATOC SA SATOC
Sector: Commercial • Location: Utqiagvik, Alaska, United States of America
Source: Dodge USA
Alaska District has a requirement to construct approximately 5 continuous miles of coastal erosion protection comprised of a revetment, armored berm, and raised and armored road along the coast of Utqiagvik. The structure extends from approximately the end of the Runway in the southwest to Dewline Road in the northeast. The revetment section consists of a layered system of filter rock, core rock,
- Status
- Closed
- Sector
- Commercial, Road, Manufacturing (Industrial)
- Location
- Utqiagvik, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about IDIQ Barrow Coastal Erosion Protection SATOC SATOC SA SATOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Alaska District has a requirement to construct approximately 5 continuous miles of coastal erosion protection comprised of a revetment, armored berm, and raised and armored road along the coast of Utqiagvik. The structure extends from approximately the end of the Runway in the southwest to Dewline Road in the northeast. The revetment section consists of a layered system of filter rock, core rock, B rock, and 2.7-ton armor stone. The crest height varies from 16.5 feet to 20 feet above MLLW. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Utqiagvik |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
