IEMA Substations
Sector: Commercial • Location: Brazil
Source: World Bank Group
In November 2008, Consorcio Madeira Transmissao, an association of the state-owned companies Furnas (24.5%) and CHESF (24.5%) and the Brazilian private company CTEEP (51%), was awarded in a competitive bidding process the contract to build and operate two substations located in the states of Rondonia and Sao Paulo. Besides Consorcio Madeira Transmissao, another company took part in the contest: Co
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about IEMA Substations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In November 2008, Consorcio Madeira Transmissao, an association of the state-owned companies Furnas (24.5%) and CHESF (24.5%) and the Brazilian private company CTEEP (51%), was awarded in a competitive bidding process the contract to build and operate two substations located in the states of Rondonia and Sao Paulo. Besides Consorcio Madeira Transmissao, another company took part in the contest: Consorcio TME TRANS (the Brazilian company Neoenergia, 34%; Alupar, 22%; the state-owned company CEMIG 22%; and Empresa Amazonense de Transmissao, 22%). The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Madeira Transmissao presented the lowest offer, a value of US$ 82.8 million (BRL 151.7 million), 9.99% below the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsors created the company Interligacao Eletrica Madeira (IEMA) to lead the project during the 30-year contract period The sponsor committed to invest US$ 655 million (BRL 1.2 billion) in the substations. The construction works commenced in October 2009, but financial closure was only achieved in September 2010, when the sponsor was granted a US$ 61.7 million (BRL 108.7 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Commercial operations commenced in May 2014. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia