IEMG Neves 1 - Mesquita Transmission line
One of 1,077 projects Taiyo tracks in Minas Gerais.
Source: World Bank Group
On November 24, 2006, Brazil’s federal regulator ANEEL awarded Interconexion Electrica SA (ISA) a 30-year contract for the construction and operation of a transmission line connecting the substations the Neves 1 and Mesquita The 500kV line was to stretch 172km and pass through 14 municipalities in Minas Gerais state. ISA formed Interligacao Eletrica de Minas Gerais SA (IEMG) as the project company
- Status
- Prospective
- Sector
- Commercial, Government, Power Generation (CCGT)
- Location
- Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about IEMG Neves 1 - Mesquita Transmission line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | On November 24, 2006, Brazil’s federal regulator ANEEL awarded Interconexion Electrica SA (ISA) a 30-year contract for the construction and operation of a transmission line connecting the substations the Neves 1 and Mesquita The 500kV line was to stretch 172km and pass through 14 municipalities in Minas Gerais state. ISA formed Interligacao Eletrica de Minas Gerais SA (IEMG) as the project company on December 13, 2006. Later, under a shareholders’ agreement entered with CYMI Holding S.A, ISA transferred to this company 40% of its participation, and the remaining 60%, to CTEEP, ISA’s subsidiary. The objective of the project was to increase the energy efficiency in Minas Gerais state. The contract was awarded to ISA in an international competitive tender organized by ANEEL that was officially titled Auction 005/2006, lot D in November 2006 . ISA won the tender by offering the lowest annual revenue of 10.8 million reais which was 40% below the asking price. The number of final bids for the auction was not publically available although over 28 companies participated in the auction for lots A-D. The project had a total cost estimated at US $66.1 million (121 million real). The project reached financial closure in late September 2008 when BNDES granted IEMG a 70.5mn-real (US $38.5 million) credit line. The debt to equity ratio was 58 to 42. The project started commercial operation in December 2008. Figures converted to USD using the period average, market rate for 2008 published by the IMF. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Minas Gerais |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Power Generation (CCGT) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia