IFMIF-DONES Preparatory Phase
The status, timeline and source of this project. A free account opens every field.
Source: EU Funding & Tenders Portal
The International Fusion Materials Irradiation Facility - Demo Oriented NEutron Source (IFMIF-DONES) is a novel Research Infrastructure based on a unique neutron source with energy spectrum and flux tuned to those expected for the first wall in future fusion reactors, to investigate radiation damage phenomena and to characterize materials irradiated under such conditions. It will also develop a un
- Status
- Closed
- Sector
- Nuclear, Government, Metal
- Location
- Spain
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about IFMIF-DONES Preparatory Phase
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The International Fusion Materials Irradiation Facility - Demo Oriented NEutron Source (IFMIF-DONES) is a novel Research Infrastructure based on a unique neutron source with energy spectrum and flux tuned to those expected for the first wall in future fusion reactors, to investigate radiation damage phenomena and to characterize materials irradiated under such conditions. It will also develop a unique high-current high duty-cycle accelerator technology, liquid metal target technology and advanced control systems. Since 2007, the original IFMIF project has been pursued by Japan and the European Union under the Broader Approach Agreement in the field of fusion energy research and in December 2017 Fusion for Energy (F4E)positively evaluated the Spain-Croatia joint proposal to site DONES in Granada (Spain) and at this moment a wide international collaboration is being fostered to design and build the facility. The primary goal of the IFMIF-DONES Preparatory Phase project is to elaborate and draft the consortium agreement allowing for the construction of the facility. During the Preparatory Phase, the Project will deal with the financial, legal and organisational issues related to the international character of the facility during its construction and operation phases. The Preparatory Phase is also the ideal framework to attract other partners, also to ensure the operation and exploitation of the project, such as the already confirmed Andalucía Region Authority and the Spanish Government, EUROfusion and F4E that cover about 75 % of construction costs. |
Location
Country | Spain |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Nuclear, Government, Metal |
Article published date | 2026-02-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
