logo

IGA Airport

Sector: Aerospace & Defense • Location: Turkey

Source: World Bank Group

Project
Active

IGA Airport is the new thirds Istanbul airport. The airport will be located between Yenikoy and Akpinar districts in the European side of Istanbul. The airport will have at least 3 runways and 3 taxi ways.

IGA Havalimani Isletmesi SA is an SPV owned by a consortium of Limak Holding, Cengiz Holding, Kolin Group, MNG Holding, and Kaylon Group; each owning equal 20% shares. IGA was awarded tender fo

Project Information FAQ

Project Information

5 Q
The project “IGA Airport” is an infrastructure initiative in the Aerospace & Defense sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IGA Airport is the new thirds Istanbul airport. The airport will be located between Yenikoy and Akpinar districts in the European side of Istanbul. The airport will have at least 3 runways and 3 taxi ways. IGA Havalimani Isletmesi SA is an SPV owned by a consortium of Limak Holding, Cengiz Holding, Kolin Group, MNG Holding, and Kaylon Group; each owning equal 20% shares. IGA was awarded tender for the airport in 2013 by the General Directorate of State Airports Authority (DHMI). 17 companies/consortium initially submitted bids, but only 4 presented. The winning consortium bid USD$29.1 billion(€22.2 billion) for the project. IGA signed a 25yr BOT agreement with DHMI in 2014. IGA reached financial closure in October of 2015. The airport is expected to cost 6486.5m USD, of which 1595m USD will be provide by sponsor equity and 4891.5m USD is to be debt financed. The 1595m USD equity will be provided in five 391m USD parts from each of the sponsors (Cengiz, Kolin, MNG, Kaylon). Debt financing is to be provided by Vakifbank (1063.4m USD), Halkbank (1063.4m USD), Ziraat Bankasi (1595m USD), DenizBank (531.7m USD), Finansbank (319m USD), and Garanti Bank (319m USD). IGA Airport is expected to be operational in 2018. https://ijglobal.com/data/transaction/26324/istanbul-third-airport-ppp http://www.igairport.com/en/ http://www.dhmi.gov.tr/aerodromes.aspx#.Vs4asNJViko http://www.ft.com/cms/s/0/72b834f8-7753-11e5-a95a-27d368e1ddf7.html#axzz417gmQsMP http://www.reuters.com/article/us-turkey-airport-idUSBRE9420RL20130503 http://infrapppworld.com/pipeline-html/awarded-emea/istanbul-third-airport-bot-project http://infrapppworld.com/2013/05/megaproject-29-turkish-consortium-wins-bot-contract-for-e7-billion-istanbul-airport.html http://www.wsj.com/articles/SB10001424127887324266904578460752801985648

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data