logo

IGA Airport

Sector: Airport • Location: Turkey

Source: World Bank Group

Project
Active

IGA Airport is the new thirds Istanbul airport. The airport will be located between Yenikoy and Akpinar districts in the European side of Istanbul. The airport will have at least 3 runways and 3 taxi ways.

IGA Havalimani Isletmesi SA is an SPV owned by a consortium of Limak Holding, Cengiz Holding, Kolin Group, MNG Holding, and Kaylon Group; each owning equal 20% shares. IGA was awarded tender fo

Status
Prospective
Sector
Airport, Aerospace & Defense, Government, Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about IGA Airport

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “IGA Airport” is an infrastructure initiative in the Airport sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IGA Airport is the new thirds Istanbul airport. The airport will be located between Yenikoy and Akpinar districts in the European side of Istanbul. The airport will have at least 3 runways and 3 taxi ways. IGA Havalimani Isletmesi SA is an SPV owned by a consortium of Limak Holding, Cengiz Holding, Kolin Group, MNG Holding, and Kaylon Group; each owning equal 20% shares. IGA was awarded tender for the airport in 2013 by the General Directorate of State Airports Authority (DHMI). 17 companies/consortium initially submitted bids, but only 4 presented. The winning consortium bid USD$29.1 billion(€22.2 billion) for the project. IGA signed a 25yr BOT agreement with DHMI in 2014. IGA reached financial closure in October of 2015. The airport is expected to cost 6486.5m USD, of which 1595m USD will be provide by sponsor equity and 4891.5m USD is to be debt financed. The 1595m USD equity will be provided in five 391m USD parts from each of the sponsors (Cengiz, Kolin, MNG, Kaylon). Debt financing is to be provided by Vakifbank (1063.4m USD), Halkbank (1063.4m USD), Ziraat Bankasi (1595m USD), DenizBank (531.7m USD), Finansbank (319m USD), and Garanti Bank (319m USD). IGA Airport is expected to be operational in 2018. https://ijglobal.com/data/transaction/26324/istanbul-third-airport-ppp http://www.igairport.com/en/ http://www.dhmi.gov.tr/aerodromes.aspx#.Vs4asNJViko http://www.ft.com/cms/s/0/72b834f8-7753-11e5-a95a-27d368e1ddf7.html#axzz417gmQsMP http://www.reuters.com/article/us-turkey-airport-idUSBRE9420RL20130503 http://infrapppworld.com/pipeline-html/awarded-emea/istanbul-third-airport-bot-project http://infrapppworld.com/2013/05/megaproject-29-turkish-consortium-wins-bot-contract-for-e7-billion-istanbul-airport.html http://www.wsj.com/articles/SB10001424127887324266904578460752801985648

Original sector

Transport

Procurement method

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Airport, Aerospace & Defense, Government, Commercial

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project