logo

Ignace Water Conservation Project

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The project entails three measures. One is leak repair in the distribution system. Another is universal metering for all users and another is installation of recirculating pump/tank units in certain properties. It is estimated that the Township is losing up to 50% of its water. It is unknown how much is being lost in the distribution system and how much is being lost by water users. In the fall of

Project Information FAQ

Project Information

3 Q
The project “Ignace Water Conservation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails three measures. One is leak repair in the distribution system. Another is universal metering for all users and another is installation of recirculating pump/tank units in certain properties. It is estimated that the Township is losing up to 50% of its water. It is unknown how much is being lost in the distribution system and how much is being lost by water users. In the fall of 2015 the Township will be undertaking a leak detection survey on the water distribution system. We expect the survey to reveal leaks. The Township will then engage a contractor to repair them. This work will involve excavating to replace leaking pipes and fittings. Some of this work may be scheduled for the 2017 season in order to avoid interfering with water metering. Currently only approximately 40 of our estimated 650 water users are metered. In the fall of 2015 the Township through a request for proposal process is intending to select a company to supply and install water meters. We are looking for a type of meter that can be read remotely. The plan is to have the meters installed in the 2016 season. Frozen waterlines are prevalent in Ignace. Rather than run water through a bleeder valve or tap, the Township wants to supply and install recirculating pump/tank units at properties where waterlines frequently freeze. The units, placed before the meter, fill up. When full the pump starts and sends the water back into the distribution system. The constant movement of water prevents freezing. The plan is to have these units installed at the same time meters are.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data