Ignace Water Conservation Project
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The project entails three measures. One is leak repair in the distribution system. Another is universal metering for all users and another is installation of recirculating pump/tank units in certain properties. It is estimated that the Township is losing up to 50% of its water. It is unknown how much is being lost in the distribution system and how much is being lost by water users. In the fall of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project entails three measures. One is leak repair in the distribution system. Another is universal metering for all users and another is installation of recirculating pump/tank units in certain properties. It is estimated that the Township is losing up to 50% of its water. It is unknown how much is being lost in the distribution system and how much is being lost by water users. In the fall of 2015 the Township will be undertaking a leak detection survey on the water distribution system. We expect the survey to reveal leaks. The Township will then engage a contractor to repair them. This work will involve excavating to replace leaking pipes and fittings. Some of this work may be scheduled for the 2017 season in order to avoid interfering with water metering. Currently only approximately 40 of our estimated 650 water users are metered. In the fall of 2015 the Township through a request for proposal process is intending to select a company to supply and install water meters. We are looking for a type of meter that can be read remotely. The plan is to have the meters installed in the 2016 season. Frozen waterlines are prevalent in Ignace. Rather than run water through a bleeder valve or tap, the Township wants to supply and install recirculating pump/tank units at properties where waterlines frequently freeze. The units, placed before the meter, fill up. When full the pump starts and sends the water back into the distribution system. The constant movement of water prevents freezing. The plan is to have these units installed at the same time meters are. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
