IH 35 Rehabilitation Project in Waco, TX
Sector: Advanced Electronics • Location: Texas, United States of America
Source: Ferrovial
Ferrovial Business Lines Projects IH 35 Rehabilitation Waco, TX Length 6.7Miles Contract Value $341Million Bridges 24 The project involves reconstruction of 6.7 miles of IH 35 in Waco, TX. The project was bid at $341 million and is the largest hard bid project to be awarded in Webber’s history. The project scope of the rehabilitation of IH 35 consists of widening and reconstruction of 6.7 miles
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects IH 35 Rehabilitation Waco, TX Length 6.7Miles Contract Value $341Million Bridges 24 The project involves reconstruction of 6.7 miles of IH 35 in Waco, TX. The project was bid at $341 million and is the largest hard bid project to be awarded in Webber’s history. The project scope of the rehabilitation of IH 35 consists of widening and reconstruction of 6.7 miles from Craven Road to 12th Street in Waco, Texas. The contract includes construction of 24 bridges, the removal of three existing concrete main lanes in both directions, replacement with four lanes of 15” continuously reinforced concrete pavement - north and southbound – and reconstruction of the existing concrete frontage roads. In addition, the project includes the installation of more than 132,000 linear feet of reinforced concrete box culverts and pipe, electrical, concrete flatwork, landscape, irrigation and pavement markings throughout the corridor. Special Features One of the challenges that the project team faces is the work over the Brazos River and the need of using barges and bulkheads (sheet-pile and compacted earth setup to form a work dock) as a mean to provide stable work surface, for both man and equipment. A special Safety plan was needed for these water operations, first to address the safety of the employees, but also the impact that construction in this area has for the environment and recreation on the river. For example, all barges must be engineered to ensure that the requirements of stability are satisfied, taking into consideration the type of equipment operated on the barges and their working radius. Cranes are most affected by this as their swing radius and the weight of their loads are much greater than any other equipment used on the barges. As a crane swings its load, it will apply forces to the barge in variable areas that may cause the barge to dip down in the water. This dipping is referred to as “List” (dipping to the lateral sides) and “Trim” (dipping to the frontside). Webber monitors the List and Trim with a “List & Trim Monitor” that is mounted in the cabin of the crane with sensors attached to the body of the crane. This monitor helps the team keep within the maximum allowable tolerances of List and Trim that are outlined by Crane Manufacturers, OSHA and ASME. Another significant challenge is that the project is located near the Baylor University campus. Due to the heavy traffic flow and adjacent retail and residential along right-of-way, the project is working during restricted hours and lane closures to minimize the impact to the traveling public and local businesses. Due to the size of the project, over 25 crews and various subcontractors work at the same time in the different areas. Also, 25 engineers and 4 superintendents supervise and coordinate the job. The schedule, the pace, the amount of people and the size of the job make this project truly a challenge. But we are working hard as a team, making sure we are all helping each other achieve our milestones, our finish dates. Everyone is cooperating with the client, with the subcontractors, and with other crews.Paloma Fernandez, Senior Project Manager. Photo Gallery |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |