logo

IH 35 (US 77 - Lone Oak Rd.)

Sector: Education • Location: TX, United States of America

Source: US Department of Transportation (USDOT)

Project
Close

Proposing to widen and reconstruct Interstate Highway 35 (IH 35) from four to six main lanes in Denton and Cooke counties, Texas, from United States Highway (US) 380 (University Drive West) to approximately 0.7 mile north of Farm to Market Road (FM) 3002 (Lone Oak Road). The proposed improvements would begin north of the IH 35 east/west split in the city of Denton and extend north along IH 35 thro

Project Information FAQ

Project Information

5 Q
The project “IH 35 (US 77 - Lone Oak Rd.)” is an infrastructure initiative in the Education sector, located in TX, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Proposing to widen and reconstruct Interstate Highway 35 (IH 35) from four to six main lanes in Denton and Cooke counties, Texas, from United States Highway (US) 380 (University Drive West) to approximately 0.7 mile north of Farm to Market Road (FM) 3002 (Lone Oak Road). The proposed improvements would begin north of the IH 35 east/west split in the city of Denton and extend north along IH 35 through the city of Sanger to north of FM 3002 in Cooke County, for a total distance of approximately 15.2 miles (see Figure 1 in Appendix A). The proposed action would construct three main lanes in each direction and two frontage road lanes in each direction along this section of IH 35. Auxiliary lanes would be constructed in certain places between ramp entrances and exits. The existing interchanges would be reconstructed and the existing two-way frontage roads would be converted to one-way operation. The improvements that are proposed at the cross streets would accommodate one-way frontage road operations and turnarounds.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data