IIRSA Argentina-Chile Connectivity Study
Sector: Road • Location: Regional
Source: Inter-American Development Bank (IADB)
The main border cross between Argentina and Chile (Cristo Redentor), has high levels of vehicular congestion as well as prolonged closings during the winter, creating serious problems to the transportation. Because of this, the Argentina-Chile Technical Group agreed to execute a diagnosis and projection study of the terrestrial transportation demand, that analyzes the different border crossings an
- Status
- Closed
- Sector
- Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about IIRSA Argentina-Chile Connectivity Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main border cross between Argentina and Chile (Cristo Redentor), has high levels of vehicular congestion as well as prolonged closings during the winter, creating serious problems to the transportation. Because of this, the Argentina-Chile Technical Group agreed to execute a diagnosis and projection study of the terrestrial transportation demand, that analyzes the different border crossings and defines the priorities of investment for each one of them. |
Original sector | TRANSPORT |
Budget |
Location
Country | World |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Regional
- Constructora Santa Fe Ltda.
- Comprehensive Midterm Review of the Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area Road Map to Development
- Supporting Integrity Due Diligence for Private Sector Projects (Subproject 1)
- DFF - DKV Mobility
- BAKU-TBILISI-CEYHAN (BTC) PIPELINE
- Business Development and Implementation Support for Non-Sovereign Operations
- Africa Transition Acceleration Fund
- AIG Silk Road Fund
