logo
ProjectBidding

Ike's Creek Restoration

Bidding · Minnesota · Last reported Feb 2025

Source: Dodge

This project, located on Ike's Creek, includes channel restoration using large wood and stone materials. The work includes but is not limited to the following: 1. Mobilization, site access, and demobilization. 2. Establishing erosion controls. 3. Establishing, maintaining, and relocating water control systems. 4. Earthwork. 5. Importing and installing in-stream habitat and channel features and lar

Status
Prospective
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
Location
Bloomington, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Ike's Creek Restoration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ike's Creek Restoration” is an infrastructure initiative in the Water Supply and Storage sector, located in Bloomington, Minnesota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project, located on Ike's Creek, includes channel restoration using large wood and stone materials. The work includes but is not limited to the following: 1. Mobilization, site access, and demobilization. 2. Establishing erosion controls. 3. Establishing, maintaining, and relocating water control systems. 4. Earthwork. 5. Importing and installing in-stream habitat and channel features and large wood. 6. Removing water control systems and erosion controls. 7. Site restoration and revegeta...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Bloomington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Government

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project