IL/DOT : CH 40 Bridge Replacement
Sector: Bridge • Location: Illinois, United States of America
Source: Dodge USA
This work shall consist of the removal of the existing structure and construction of a single span reinforced concrete slab on steel beam bridge supported on integral abutments with concrete wingwalls, 74 -0 back to back of abutments, 30 -0 out to out of deck, and with a 20 degree left ahead skew. Also included are channel excavation and protection, erosion control measures, seeding, ~676 of Count
- Status
- Closed
- Sector
- Bridge, Cement, Road, Steel, Metal, Commercial
- Location
- Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about IL/DOT : CH 40 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work shall consist of the removal of the existing structure and construction of a single span reinforced concrete slab on steel beam bridge supported on integral abutments with concrete wingwalls, 74 -0 back to back of abutments, 30 -0 out to out of deck, and with a 20 degree left ahead skew. Also included are channel excavation and protection, erosion control measures, seeding, ~676 of County Highway 40 hot-mix asphalt replacement, shoulder widening for traffic barrier terminals, and ot... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Steel, Metal, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
