logo
ProjectClosed

IL/DOT: Bridge Replacement (CO 109)

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Replace the existing structure carrying North 8th Street over Spring Creek with a 3-span PPC deck beam bridge, curb and gutter, and guardrail in Springfield.

Status
Closed
Sector
Bridge, Road, Mass Transit, Rail, Commercial
Location
Springfield, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IL/DOT: Bridge Replacement (CO 109)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: Bridge Replacement (CO 109)” is an infrastructure initiative in the Bridge sector, located in Springfield, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace the existing structure carrying North 8th Street over Spring Creek with a 3-span PPC deck beam bridge, curb and gutter, and guardrail in Springfield.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Springfield

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Mass Transit, Rail, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project