logo

IL/DOT: I-39/US20 Reconstruction (CO 002) REBID

Closed · Illinois · Last reported Sep 2025

Source: Dodge

Project
Closed

2.09 miles of reconstruction of I-39/US 20 from 0.3 mile east of Mulford Rd to 0.2 mile north of Harrison Ave. Phase III engineering services are required for construction contract 64C24, reconstruction of I39/US20 from 0.3 mile east of Mulford Road to 0.2 mile north of Harrison Avenue, which includes reconstructing and widening I-39/US20 mainline pavement, reconstructing six (6) bridges, construc

Status
Closed
Sector
Tunnel, Road, Bridge, Manufacturing (Industrial), Commercial
Location
Rockford, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about IL/DOT: I-39/US20 Reconstruction (CO 002) REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: I-39/US20 Reconstruction (CO 002) REBID” is an infrastructure initiative in the Tunnel sector, located in Rockford, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

2.09 miles of reconstruction of I-39/US 20 from 0.3 mile east of Mulford Rd to 0.2 mile north of Harrison Ave. Phase III engineering services are required for construction contract 64C24, reconstruction of I39/US20 from 0.3 mile east of Mulford Road to 0.2 mile north of Harrison Avenue, which includes reconstructing and widening I-39/US20 mainline pavement, reconstructing six (6) bridges, constructing new Cherry Valley Path (CVP) tunnel under I-39/US20, reconstructing Madigan Creek Culvert un...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Rockford

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Tunnel, Road, Bridge, Manufacturing (Industrial), Commercial

Article published date

2025-09-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project