logo
ProjectPlanning Schematics

IL/DOT: I-55 Route 126 Phase II Project

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Phase II engineering services for improvements for I-55 Interchange (FAI 55) at Illinois Route 126. The project s scope includes reconstruction of a new diamond interchange at Illinois Route 126 with the realignment of IL 126 as a two-way roadway west of I-55. The improvement includes, but not limited to, bridge widening, bridge replacement, proposed retaining walls, ramp construction, traffic sig

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Bridge, Road
Location
Plainfield, Illinois, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IL/DOT: I-55 Route 126 Phase II Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: I-55 Route 126 Phase II Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Plainfield, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Phase II engineering services for improvements for I-55 Interchange (FAI 55) at Illinois Route 126. The project s scope includes reconstruction of a new diamond interchange at Illinois Route 126 with the realignment of IL 126 as a two-way roadway west of I-55. The improvement includes, but not limited to, bridge widening, bridge replacement, proposed retaining walls, ramp construction, traffic signal installation, drainage improvements, and all other related work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Plainfield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Bridge, Road

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project