logo

IL/DOT: I-70 Road Reconstruction

Sector: Bridge • Location: Montrose, Illinois, United States of America

Source: Dodge

Project
Planning Schematics

Initially, IDOT said lane closures will occur in the westbound lanes during daytime hours for various operations including patching, striping, and guardrail updates. After that work has been completed, barrier walls will be built with median crossovers, and all eastbound traffic will be diverted to the left westbound lane. IDOT said the eastbound bridge over the Montrose Blacktop will also be repl

Status
Prospective
Sector
Bridge, Power Transmission, Mass Transit, Road, Rail, Power Generation (CCGT), Commercial
Location
Montrose, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about IL/DOT: I-70 Road Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: I-70 Road Reconstruction” is an infrastructure initiative in the Bridge sector, located in Montrose, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Initially, IDOT said lane closures will occur in the westbound lanes during daytime hours for various operations including patching, striping, and guardrail updates. After that work has been completed, barrier walls will be built with median crossovers, and all eastbound traffic will be diverted to the left westbound lane. IDOT said the eastbound bridge over the Montrose Blacktop will also be replaced. The eastbound Montrose on- and off-ramps will be closed while the crossovers are being util...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Montrose

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Power Transmission, Mass Transit, Road, Rail, Power Generation (CCGT), Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project