logo
ProjectPlanning Schematics

IL/DOT: Intersection Improvement Phase I/II

One of 10,000+ projects Taiyo tracks in Illinois.

Source: Dodge USA

Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for IL Route 3 from New Poag Road to Northgate Industrial Drive in Madison County. Currently, IL Route 3 has been identified for pavement replacement in accordance with the Department s Transportation Asset Management Plan (TAMP). The proposed improvement is t

Status
Prospective
Sector
Water Supply and Storage, Commercial, Road, Manufacturing (Industrial), Car parking, Waste Processing and Treatment, Automotive
Location
Springfield, Illinois, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IL/DOT: Intersection Improvement Phase I/II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: Intersection Improvement Phase I/II” is an infrastructure initiative in the Water Supply and Storage sector, located in Springfield, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for IL Route 3 from New Poag Road to Northgate Industrial Drive in Madison County. Currently, IL Route 3 has been identified for pavement replacement in accordance with the Department s Transportation Asset Management Plan (TAMP). The proposed improvement is to replace the existing pavement while staying within the footprint of the existing roadway, where...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Springfield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Road, Manufacturing (Industrial), Car parking, Waste Processing and Treatment, Automotive

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project