IL/DOT: Pavement Construction
Sector: Water Supply and Storage • Location: Hoffman Estates, Illinois, United States of America
Source: Dodge
Const. variable width pav't w/ HMA pav't (full depth)(6")(399.2 sq yd);incl 13,485 ton HMA surf/bind cse mix D, N50; 150 cu yd earth ex; 155 cu yd rem & disp unsuit mat'l; 472 sq yd agg sub impr (12"); 114,720 sq ft PCC conc s/w (5"); 3,645 ft comb con c&g, spl (M3.12 & B6.12); 22,075 ft comb c&g r&r, spl; 4,760 sq yd PCC d/w pav't (6"); 470 sq yd pav't rem; 3,310 sq yd pav't rem spl; 103,800 sq y
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Road
- Location
- Hoffman Estates, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about IL/DOT: Pavement Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Const. variable width pav't w/ HMA pav't (full depth)(6")(399.2 sq yd);incl 13,485 ton HMA surf/bind cse mix D, N50; 150 cu yd earth ex; 155 cu yd rem & disp unsuit mat'l; 472 sq yd agg sub impr (12"); 114,720 sq ft PCC conc s/w (5"); 3,645 ft comb con c&g, spl (M3.12 & B6.12); 22,075 ft comb c&g r&r, spl; 4,760 sq yd PCC d/w pav't (6"); 470 sq yd pav't rem; 3,310 sq yd pav't rem spl; 103,800 sq yd var depth grind (0-3"); 3,470 sq yd sodding, spl; 360 ft storm sewer, rg, cl A, ty.1(12"-36");1... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Hoffman Estates |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
