logo

IL/DOT: Pavement Replacement

Sector: Road • Location: Springfield, Illinois, United States of America

Source: Dodge USA

Project
Planning Schematics

Phase I engineering services are required for the preparation of a Project Report and Categorical Exclusion determination for pavement replacement and other related work .FAP 840 & FAU 6198, PHASE I

Status
Prospective
Sector
Road, Government, Commercial, Manufacturing (Industrial)
Location
Springfield, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IL/DOT: Pavement Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: Pavement Replacement” is an infrastructure initiative in the Road sector, located in Springfield, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase I engineering services are required for the preparation of a Project Report and Categorical Exclusion determination for pavement replacement and other related work .FAP 840 & FAU 6198, PHASE I

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Springfield

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project