logo
ProjectBid Results

IL/DOT: PCC Shared-Use Path(CO143)

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Construct a PCC Shared-Use Path with aggregate base, storm sewer pipes, and riprap along the Mississippi River from 17th Street to intersection of 1st Avenue/19th Street in Moline.

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
Location
Moline, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IL/DOT: PCC Shared-Use Path(CO143)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: PCC Shared-Use Path(CO143)” is an infrastructure initiative in the Water Supply and Storage sector, located in Moline, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct a PCC Shared-Use Path with aggregate base, storm sewer pipes, and riprap along the Mississippi River from 17th Street to intersection of 1st Avenue/19th Street in Moline.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Moline

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Commercial

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project