logo
ProjectClosed

IL/DOT: Tollway system Improvement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Phase III engineering services are required for the construction inspection and supervision at selected locations on the Tollway system. Task orders under the blanket agreement will be negotiated and authorized by the Tollway on an as-needed basis. Typical tasks will include projects that are required for the Tollway system, and may include, but not be limited to the following projects: 1. Pavemen

Status
Closed
Sector
Commercial, Manufacturing (Industrial), Road
Location
Downers Grove, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about IL/DOT: Tollway system Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “IL/DOT: Tollway system Improvement” is an infrastructure initiative in the Commercial sector, located in Downers Grove, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase III engineering services are required for the construction inspection and supervision at selected locations on the Tollway system. Task orders under the blanket agreement will be negotiated and authorized by the Tollway on an as-needed basis. Typical tasks will include projects that are required for the Tollway system, and may include, but not be limited to the following projects: 1. Pavement marking installation 2. Signing improvements 3. Roadway Job Order Contracting 4. Facility Impro...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Downers Grove

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Road

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project