IL/DOT: US 45 Springfield Ave. Curtis Rd R3/D5 Ph 3
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Phase III engineering services are required to provide construction inspection for the Standard Overlay, ADA Improvements and Traffic Signal Modernization on US 45. Phase III engineering services are required to provide construction inspection for the Standard Overlay, ADA Improvements and Traffic Signal Modernization on US 45.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Champaign, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about IL/DOT: US 45 Springfield Ave. Curtis Rd R3/D5 Ph 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase III engineering services are required to provide construction inspection for the Standard Overlay, ADA Improvements and Traffic Signal Modernization on US 45. Phase III engineering services are required to provide construction inspection for the Standard Overlay, ADA Improvements and Traffic Signal Modernization on US 45. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Champaign |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
