logo

Iljin Industries Co., Ltd.

Sector: Energy Storage • Location: Korea, Republic of

Source: International Finance Corporation (IFC)

Project
Completed

Summary Of Project Information (SPI)Project NameKorea-ILJIN Industries Co., Ltd.          RegionEast Asia and the PacificSectorProject No009077Projected Board DateSeptember 30, 1998Company NameILJIN Industries Co., Ltd.Technical Partner and/or Major Shareholders The Company was established and is owned 71.4% by Mr. Huh, chairman, remaining shareholders consist of 28.6% by ILJIN Group companies: IL

Project Information FAQ

Project Information

4 Q
The project “Iljin Industries Co., Ltd.” is an infrastructure initiative in the Energy Storage sector, located in Korea, Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Summary Of Project Information (SPI)Project NameKorea-ILJIN Industries Co., Ltd.          RegionEast Asia and the PacificSectorProject No009077Projected Board DateSeptember 30, 1998Company NameILJIN Industries Co., Ltd.Technical Partner and/or Major Shareholders The Company was established and is owned 71.4% by Mr. Huh, chairman, remaining shareholders consist of 28.6% by ILJIN Group companies: ILJIN Corporation (11.4%) and ILJIN Electric (17.2%). ILJIN Industries is not listed on the Korea Stock Exchange. The Company was founded in 1996 and manufacturers power cables for Korea Electric Power Corporation (KEPCO), industrial use, and exports.Project Cost Including proposed IFC investment The proposed project cost is US$37 million. It consists of two parts: financial restructuring of US$22 million, and new capital expenditures of US$15 million. Total proposed IFC funding is US$20 million, which will be a combination of A-Loan and equity. IFC B-Loan is currently being contemplated for US$10 million. The Company and the ILJIN Group (Mr. Huh) has a plan to contribute US$7 million.   Location of project and Description of site The Company''s headquarters and plant is located in Hwasung-gun, Kyunggi-do, about 30 kilometers from Seoul. The total land available is 67,252m2 and the total factory covered area is 27,156m2. The new capital expenditures will install a vertical type vulcanizing (VCV) line in the existing plant.   Description of Company and Purpose of Project The Company manufactures various types of power cables: extra high voltage (EHV), high voltage, and medium voltage. Cables are used for transmission and distribution of electricity. The largest purchaser is KEPCO. The Company currently has one VCV and one catenary vulcanizing line (CCV) and plans to install the second VCV line in view of growing domestic demand in EHV cable. IFC will play an essential role in assisting the Korean manufacturer to produce value-added power cables to meet domestic demand. The Company is internationally competitive and has technical assistance contracts with leading cable manufacturers from Japan and Switzerland. Its world class production facility achieves competitive productivity. Environmental Category and Issues This is an environmental review category B project. The project involves the expansion of facilities within the existing site boundary and no additional land is required. Air emissions from this facility will be negligible, light oil for boilers is stored in an underground tank connected directly to the boilers, and emissions of particulate matter, sulfur dioxide and nitrous oxides will fall within World Bank Group guidelines. No process effluents are generated by the plant and sanitary effluent is treated before discharging to the public sewer. There are existing systems for the use, storage and disposal of solvents and hazardous wastes, and material handling is undertaken in a rational and planned manner. The majority of solid waste (PVC, polyethylene, copper, aluminum and domestic waste) is recycled by professional companies under contract to the sponsor. There is a committee for Health and Safety which meets on a regular basis with direct links to senior management. The facility has an environmental policy statement which has been endorsed by senior management and suitably qualified environmental supervisors have been appointed to monitor environment and health and safety issues relating to the site.      The is from the InfoShop.Date SPI sent to InfoShop August 26, 1998“This Summary of Project Information is prepared and distributed to the public in advance of consideration of the proposed transaction by the Corporation’s Board of Directors. It is provided for the purpose of enhancing the transparency of IFC’s activities and should not be construed as presuming the outcome of IFC Board consideration.”For Additional Information contact: Corporate Relations Unit -telephone: (202) 473-7711facsimile: (202) 974-4384Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data