Ilkeston Flooding Strategy
The status, timeline and source of this project. A free account opens every field.
Source: National Infrastructure and Service Transformation Authority (NISTA)
Ilkeston’s eastern catchment has suffered both surface water and sewer flooding over the last 25 years. The catchment is a combined sewer network, with localised surface water networks. The main aim of the solution will be to separate surface water from the existing combined network by the provision of new surface water network, using Sustainable Drainage Systems (SUDs) features to control its dis
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- United Kingdom
- Updated
- 19 Nov 2026
- Source
- National Infrastructure and Service Transformation Authority (NISTA)
ConstructChat
Ask ConstructChat about Ilkeston Flooding Strategy
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | scoping |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Ilkeston’s eastern catchment has suffered both surface water and sewer flooding over the last 25 years. The catchment is a combined sewer network, with localised surface water networks. The main aim of the solution will be to separate surface water from the existing combined network by the provision of new surface water network, using Sustainable Drainage Systems (SUDs) features to control its discharge rate into the river. There will also need to be a small amount of extra capacity provided locally on the combined network to reduce flooding. The River Erewash has a poor water quality status under the Water Framework Directive. There are a number of CSOs in the eastern catchment which will be improved. This and the separation will improve the water quality too. |
Original sector | Flood/Coastal Defence |
Location
Country | United Kingdom (UK) |
Source
Source | National Infrastructure and Service Transformation Authority (NISTA) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-09-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United Kingdom
- Brigg Biomass Power Plant North Lincolnshire
- Gas to the West Project
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- Horse Hill Oil Field, Surrey
- Nestle Ski Yoghurt Line Expansion, Cuddington, Cheshire
- Costa Coffee Roastery, Basildon, Essex, UK
- Aulds Frozen Foods, New Manufacturing Plant, Inchinnan, Scotland
- Sealord Fish Processing, Caistor
