Illawarra Rail Freight Line PPP project
Closed · Australia
Source: InfraPPPWorld
The project involves the development of a 35-kilometre rail freight line in the Illawarra. Construction on the line started in 1983 but was halted due to an economic downturn and the forecast growth in coal traffic not eventuating. The project will be developed on a design, build, operation and maintenance (DBOM) basis. The contract period is estimated about 20 years.
- Status
- Closed
- Sector
- Mass Transit, Rail
- Location
- Australia
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Illawarra Rail Freight Line PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a 35-kilometre rail freight line in the Illawarra. Construction on the line started in 1983 but was halted due to an economic downturn and the forecast growth in coal traffic not eventuating. The project will be developed on a design, build, operation and maintenance (DBOM) basis. The contract period is estimated about 20 years. |
Original sector | Transport |
Procurement method |
Location
Country | Australia |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
