logo

Illini Hall Replacement Phase 3

Sector: Metal • Location: Champaign, Illinois, United States of America

Source: Dodge USA

Project
Gc Bidding

The new Illini Hall work includes earthwork, sitework, drilled piers, concrete foundations, structural steel, metals, masonry, limestone and slate, CFMF, gypsum board, plaster, aluminum curtainwall, TPO/PVC roofing, tile, equipment, and complete mechanical, HVAC, controls, plumbing, fire protection, electrical, lighting, fire alarm, emergency generator, and audio-visual systems and utilities.

Status
Under Construction
Sector
Metal, Education, Steel, Cement, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Commercial
Location
Champaign, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Illini Hall Replacement Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Illini Hall Replacement Phase 3” is an infrastructure initiative in the Metal sector, located in Champaign, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The new Illini Hall work includes earthwork, sitework, drilled piers, concrete foundations, structural steel, metals, masonry, limestone and slate, CFMF, gypsum board, plaster, aluminum curtainwall, TPO/PVC roofing, tile, equipment, and complete mechanical, HVAC, controls, plumbing, fire protection, electrical, lighting, fire alarm, emergency generator, and audio-visual systems and utilities.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Champaign

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Education, Steel, Cement, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Commercial

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project