logo
ProjectPre-Design

Illinois Valley Reliability Project

Sector: Power Generation (CCGT) • Location: Illinois, United States of America

Source: Dodge

Construction of a new 23-mile, 138-kilovolt transmission line connecting a new Lima switching station near Peru to an upgraded Princeton substation. The project aims to support energy reliability and resiliency across the region.

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Commercial
Location
Illinois, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Illinois Valley Reliability Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Illinois Valley Reliability Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Construction of a new 23-mile, 138-kilovolt transmission line connecting a new Lima switching station near Peru to an upgraded Princeton substation. The project aims to support energy reliability and resiliency across the region.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Commercial

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project