logo

Iltek Susurluk Wind Farm

Sector: Hydro • Location: Turkey

Source: World Bank Group

Project
Active

Alentek Enerji was planning the development of the 45 MW Susurluk wind farm, near Susurluk, Balikesir province. The project was designed to comprise 18 turbines of 2.5 MW, producing an annual output of 145 GWh. Alentek Enerji was an SPV set up by Iltek Iletsim Teknolojileri, the wind power subsidiary of Turkish industrial conglomerate Eksim Investment holding.

The project was commissioned in Feb

Status
Prospective
Sector
Hydro, Wind, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Commercial, Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Iltek Susurluk Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Iltek Susurluk Wind Farm” is an infrastructure initiative in the Hydro sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Alentek Enerji was planning the development of the 45 MW Susurluk wind farm, near Susurluk, Balikesir province. The project was designed to comprise 18 turbines of 2.5 MW, producing an annual output of 145 GWh. Alentek Enerji was an SPV set up by Iltek Iletsim Teknolojileri, the wind power subsidiary of Turkish industrial conglomerate Eksim Investment holding. The project was commissioned in February 2011. Equipment was supplied by German Nordex under a supply contract signed in November 2010. Iltek Iletsim holds permits for a total of seven wind farms, including Susurluk, with a total capacity of 246.5 MW. Amongst these wind farms are the 40 MW Amasya and the 40 MW Tokat wind farms, also equiped with Nordex turbines under an equipment supply contract for 16 turbines announced in August 2011 and financed through Turkey's Yapi Kredi Bank (EUR68 million, $90.4 million). Nordex' local subsidiary was Nordex Enerji AS. The project company has applications pending for a further 584 MW of wind capacity and 294 MW of hydropower. The turbine purchase was financed through Ak Bank, Turkey, with a EUR37 million ($51 million) loan. As of October 2011, no further details about the financial structure of the project were available. http://www.eksim.com.tr/en/sectors/energy/wind_power_plants.html

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Commercial, Government

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project