logo
ProjectPlanned

Imperial County Data Center Project

The owner, status and timeline of this project. A free account opens every field.

Source: The Desert Review

A proposed data center complex nearly one million square feet in size located at the intersection of Aten and Clark Roads in unincorporated Imperial County. The project includes a 950,000 square foot data center building, a large-scale battery energy storage system, electrical substations, cooling towers, 100 natural gas-powered backup emergency generators, water storage tanks, an on-site wastewat

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Energy Storage, Data Center, Natural Gas, Commercial
Location
Imperial, California, United States of America
Updated
22 Jul 2026
Source
The Desert Review

ConstructChat

Ask ConstructChat about Imperial County Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Imperial County Data Center Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Imperial, California, United States. Taiyo aggregates data on it from The Desert Review.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed data center complex nearly one million square feet in size located at the intersection of Aten and Clark Roads in unincorporated Imperial County. The project includes a 950,000 square foot data center building, a large-scale battery energy storage system, electrical substations, cooling towers, 100 natural gas-powered backup emergency generators, water storage tanks, an on-site wastewater treatment center, and transmission interconnections to IID power lines.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

California

City

Imperial

Source

Source

The Desert Review

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Energy Storage, Data Center, Natural Gas, Commercial

Article published date

2025-12-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project