Implementation and deployment of the new bus network in conjunction with the implementation of the bus rapid transit (BRT)
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Project for the implementation and deployment of a bus network that has been reviewed based on the possible implementation of the bus rapid transit (BRT) or articulated buses. The new hierarchy of the Réseau de transport de la Capitale (RTC) bus network which will operate with the possible implementation of a BRT or articulated buses is detailed in the BRT design development study. This network re
- Status
- Closed
- Sector
- Car parking, Automotive
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Implementation and deployment of the new bus network in conjunction with the implementation of the bus rapid transit (BRT)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project for the implementation and deployment of a bus network that has been reviewed based on the possible implementation of the bus rapid transit (BRT) or articulated buses. The new hierarchy of the Réseau de transport de la Capitale (RTC) bus network which will operate with the possible implementation of a BRT or articulated buses is detailed in the BRT design development study. This network redeployment project is more like a transportation plan in that it evaluates the possibility of reviewing the network organization, the location of the stops and the installation of central service infrastructures (major hubs, minor hubs, terminuses, bus shelters, incentive parking lots, etc.). Whether there is a BRT or not, these elements must still be reorganized. This project is therefore not limited to considering the implementation of a BRT. The revised service could be organized around an articulated bus service rather than a BRT. |
Original sector | Public Transit |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
