logo

Improving access to sanitation for host communities and refugees in Ramtha and Sahel Houran

Sector: Hydro • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The project aims at developing and expanding the capacity of the sanitation system in the Ramtha and Sahel Houran areas with the collection and treatment of wastewater for a beneficiary population of 180,000 inhabitants by 2030 (i.e. a connection rate of 63% against 25% today).A new wastewater treatment plant with a final capacity of 22,000m3/day will be built in 2 phases, next to the current plan

Project Information FAQ

Project Information

4 Q
The project “Improving access to sanitation for host communities and refugees in Ramtha and Sahel Houran” is an infrastructure initiative in the Hydro sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims at developing and expanding the capacity of the sanitation system in the Ramtha and Sahel Houran areas with the collection and treatment of wastewater for a beneficiary population of 180,000 inhabitants by 2030 (i.e. a connection rate of 63% against 25% today).A new wastewater treatment plant with a final capacity of 22,000m3/day will be built in 2 phases, next to the current plant. The effluents treated to the standards for the reuse of purified water will then be conveyed by pumping through an 8-km trunk line to the Shalala treatment plant in order to be then transferred by gravity towards the King Talal dam and the King Abdullah Canal which serves the irrigated perimeters of the Jordan Valley. The project includes the construction of the first phase of the plant (wastewater sector of 11,000m3/day with treatment of the produced sludge) and the installation of around 100 km of networks and 4 pumping stations.A social component of the project will also finance the connection to thesewage network and the rehabilitation of sanitary facilities inside homes, allowing 3,200 households among the most vulnerable of the host communities and Syrian refugees, as well as certain public buildings (schools, health centers) to access a quality sanitation service.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data