logo

Improving drinking water supply for the city of Guilin and preserving resources

Sector: Airport • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The project aims to increase the city’s drinking water treatment capacity by 200,000 m3 a day by building a new drinking water plant. The plant will supply the new Lingui, Balijie and airport districts.The course of the Li River, which will supply this plant, is regulated upstream from Guilin by a series of storage dams. This should ensure sufficient high-quality resources in the long term, includ

Project Information FAQ

Project Information

4 Q
The project “Improving drinking water supply for the city of Guilin and preserving resources” is an infrastructure initiative in the Airport sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to increase the city’s drinking water treatment capacity by 200,000 m3 a day by building a new drinking water plant. The plant will supply the new Lingui, Balijie and airport districts.The course of the Li River, which will supply this plant, is regulated upstream from Guilin by a series of storage dams. This should ensure sufficient high-quality resources in the long term, including during periods of severe low-water levels. The recommended treatment process provides for the implementation of compact technologies aimed at limiting the land area of the plant.The project is the second step in a broader program including the creation of a river water intake and pumping of the water to the treatment plant at the upstream end, and strengthening and extending the treated water supply system downstream.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data