logo

Improving National Roads for Inclusive Growth in Mindanao Project

Sector: Road • Location: Philippines

Source: Asian Development Bank (ADB)

Project
Closed

The impact of the project will be improved accessibility of transport infrastructure. The outcome of the project will be improved quality of the national road network in Mindanao. The outputs will be (i) improvement of about 400 km of 10 national roads; (ii) detailed engineering design for roads to be improved under future projects; and (iii) strengthened institutional capacity of DPWH. The road i

Project Information FAQ

Project Information

5 Q
The project “Improving National Roads for Inclusive Growth in Mindanao Project” is an infrastructure initiative in the Road sector, located in Philippines. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The impact of the project will be improved accessibility of transport infrastructure. The outcome of the project will be improved quality of the national road network in Mindanao. The outputs will be (i) improvement of about 400 km of 10 national roads; (ii) detailed engineering design for roads to be improved under future projects; and (iii) strengthened institutional capacity of DPWH. The road improvement works will include paving earth roads, replacing road sections washed out by floods, widening existing roads, adding surface overlays, and replacement and strengthening of bridges. The works will incorporate international best practice for road safety, climate change adaptation, and seismic resistance. The detailed design for the project roads will be carried out under RIIDP. The institutional capacity development component will be designed during the PPTA based on an assessment of DPWH's capacity. It will likely focus on the capacity of the DPWH regional and district offices in the project area, particularly on project implementation and dealing with increasingly frequent natural disasters.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data