Improving Regional Connectivity and EU Integration
One of 1,462 projects Taiyo tracks in Bosnia and Herzegovina.
Source: World Bank Group
The Project will support activities that will improve BiH connectivity with EU and ensure sustainable highway financing. Completing the missing link of EU TEN-T Corridor Vc will improve regional, national and international connectivity in the Western Balkans and would ensure the link to EU is fully completed. The project facilitates economic development in the region and will create significant sh
- Status
- Prospective
- Sector
- Road, Rail, Mass Transit, Tunnel, Commercial
- Location
- Bosnia and Herzegovina
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Improving Regional Connectivity and EU Integration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project will support activities that will improve BiH connectivity with EU and ensure sustainable highway financing. Completing the missing link of EU TEN-T Corridor Vc will improve regional, national and international connectivity in the Western Balkans and would ensure the link to EU is fully completed. The project facilitates economic development in the region and will create significant short-term local employment opportunities during highway construction. In addition, the project will improve overall performance of the transport sector by removing some of the through traffic from the local road network reducing congestion, improving safety and resilience of the network connectivity, and rethinking the overall financing scheme for the highway sector in a manner to ensure long term sustainability of the network management. This will be achieved through 2 components: (i) Improved EU integration and regional connectivity and (ii) improved highway network management and financial sustainability in BIH.(i) Improved EU integration and regional connectivity: This component will finance completion of a missing 36.5km link on the EU TEN-T Vc Corridor from Johovac to Vukosavlje. Corridor Vc is the main north-south transport route in BiH and connects Budapest (Hungary) to the Adriatic port of Ploče (Croatia). Within BiH, Corridor Vc’s total length is approximately 335 km. The project section passes through rural areas with a number of linear villages on two existing regional roads: The M-17 (single lane in each direction) passing along the left bank of the River Bosna and the R-465 (single lane in each direction) along the right bank, parallel to the railway road Doboj – Modriča. The alignment passes mainly through a wide plain of predominantly cultivated land. Close to the end of the section the alignment enters the alluvial plain of the Bosna River and remains in the plain until the end. The alluvial plane is often flooded by the Bosna River. The most important structures proposed along the alignment are the cut-and-cover tunnel Dobor (approx. 1 km) and four bridges over the Bosna River (up to 600 m each), and two Trumpet type interchanges. The entire alignment is proposed on the embankment with an average height of 4.25 m. The road will have a design speed of 120 km/h and be approximately 28 m wide and accommodate 2 running lanes of 3.75 m and a hard shoulder of 2x1.5 m and a central reserve of 4 m.Detailed design is available but is more than 5 years old and would need an update. Proposed approach is to use Design and Build contract, where structures and alignment will not be changed but contractor will have opportunity to propose specific construction methodologies and some changes in materials or specifications, as well as the detailing of minor elements such as noise barriers and fencing. Estimated value of the project with contingencies is EUR 500 million. (ii) Improved highway network management and financial sustainability in BIH. In addition to completion of missing TEN-T link, the project will support introduction of ITS along the highway network, selected measures to improve highway network resilience to the natural hazards, and enhancing financial sustainability of the transport sector in general and RS Highway Company in particular. Proposed financing approach: The Project will support the financing by partnering with other IFIs and securing EU grants. Utilizing IBRD and MIGA Guarantee mechanisms will be explored as unique feature of the operation, ensuring the higher participation of the private and commercial sector in the transport management. |
Budget |
Location
Country | Bosnia and Herzegovina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Mass Transit, Tunnel, Commercial |
Article published date | 2026-08-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
