In-line Baggage System Facility Project
Sector: Manufacturing (Industrial) • Location: Melbourne, Florida, United States of America
Source: Dodge USA
The Owner seeks an in-line baggage system facility capable of handling the airport's current and future growth. Work shall be performed while maintaining existing operations that do not interfere with commercial airline services. Temporary facilities will be required to maintain current baggage screening capacity. The project consists of: Sitework and Site Infrastructure, Demolition, Concrete, Ste
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Cement, Airport, Steel, Metal, Government
- Location
- Melbourne, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about In-line Baggage System Facility Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Owner seeks an in-line baggage system facility capable of handling the airport's current and future growth. Work shall be performed while maintaining existing operations that do not interfere with commercial airline services. Temporary facilities will be required to maintain current baggage screening capacity. The project consists of: Sitework and Site Infrastructure, Demolition, Concrete, Steel, Miscellaneous Metals, Interior Renovations, Interior Finishes, Casework, Doors, Windows, Hard... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Melbourne |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Cement, Airport, Steel, Metal, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
